Things that go bump in the night
11 years ago
Lots of compost.
Gathered up some tools.
Took a look at the spot I was going to put the new bed.
Cutting sod and breaking ground.
From then on, we move the the dirt and compost from the next row into the the working trench we have going.
I used a long board to give me a place to stand without compacting the bed.
Buffy seemed to find the compost bags very interesting.
I picked up two different cover seed mixes from Naomi's.
I scratched some rows into the area behind the garage for the gardenway mix. I'm hoping this will work as chicken fodder in the spring after it gets the winter to work as a cover crop.
Excuse me for a moment. Time for a snack.
I laid a path in the middle of the garden bed that I thought might be nice with some cocoa husks as mulch.
The chickens seemed to think the husks were pretty cool.
We picked up some kale that I tucked in at the last minute. 
We started with a design that we developed collaboratively starting with the idea of using a diagonal element and maintaining symmetry. From this we puzzled out several design challenges to maintain balance, not have it get too busy, not have to many cases were seems lined up in a way that was unappealing, etc. Where we needed a half-paver we just placed one on end in the design to mark the spot. When we had something we all liked, we took some photos to record the design for later.
The first step (since the sod was kindly already removed for us) was to determine our excavation depth and start digging. The depth calculation was a little tricky since we wanted
We next put in the geotextile fabric to keep our gravel bed from mingling with the subsoil. Ew.
We laid out a 3-4-5 right triangle to give us a good right angle for staking two sides of the edge restraint in place. After this, we laid down 7/8" screed rails to level our bedding sand with the screed board (which was just another piece of edge restraint).
Once we had a sand bed we liked we reassembled our paver design, with the half-pavers cut on the paver saw with a diamond blade.
Transferring the pavers onto the sand beg was very satisfying. We worked from one corner towards the opposite. A few taps of attitude adjustment from the rubber mallet were needed to keep the pavers in line.
We swept in joint sand and used the plate compactor to settle it in.
Looked good in the end.
High fives were had by all.
As an experiment we placed some leaves from a red maple (Acer rubrum) in the bottom on a small bed of sand. The form was made from screwed together lengths of 2x4 that we cut with a circular saw.


The excavation was already done for us and the geotextile fabric was in place. While folks gathered up gravel and poured the first lift, I brought over the plate compactor on the compact utility loader.
After the lift was roughly level Juan Carlos used the plate compactor to jiggle everything into place. Pavers were used to edge the path with a lot of attention paid to keeping everything straight.
After the edges were well positioned we filled the soil outside the path to support the edges while the next lift of gravel was poured in and raked to a rough level.
This lift was hand tamped and cleaned up with the addition of a little more gravel as needed.
In the end, it looked pretty good. 




