Showing posts with label skills. Show all posts
Showing posts with label skills. Show all posts

Saturday, June 11, 2011

Gardening at 1860s Kitchen Garden

I volunteered for the first time at the 1860's Kitchen Garden at Champoeg State Park. It has a lovely rustic arbor covered with hops.
The garden has several prepared beds. Most of the bed is typically in one crop with a little patch at the end need the path planted in something different.

I liked the use of cloches (glass bell jar) to give some plants a head start.

There were some terrific trellises made from apple tree trimmings. Some had the buds bloom after they were planted.
Here is a nice arrangement for beans to climb on...
I worked on making a large trellis that we took to calling trellizilla that will obscure the modern electrical box once the plants grow up.

A view of the garden with the threshing barn beyond.
I liked the look of their compost bins as well.

Thursday, October 28, 2010

Landscape Construction -- Interlocking pavers

The interlocking paver project in Landscape Construction was a great team effort.

We started with a design that we developed collaboratively starting with the idea of using a diagonal element and maintaining symmetry. From this we puzzled out several design challenges to maintain balance, not have it get too busy, not have to many cases were seems lined up in a way that was unappealing, etc. Where we needed a half-paver we just placed one on end in the design to mark the spot. When we had something we all liked, we took some photos to record the design for later.

The first step (since the sod was kindly already removed for us) was to determine our excavation depth and start digging. The depth calculation was a little tricky since we wanted
excavation depth = 4" bed + 7/8 " sand + 2 3/8" paver - 1/8" settling - 1" proud
The last term reflecting the fact that (especially in Oregon) we want the finish grade of the path to end up an inch above the surrounding grade. This keeps things high and dry.

We next put in the geotextile fabric to keep our gravel bed from mingling with the subsoil. Ew.

A little thought went into how much fabric we needed to make sure we had enough to keep the gravel in the sides of the excavation.

The gravel went in in three lifts. We used the plate compactor and some hand tamping after each lift. The third lift was required because of the settling that occurred through compaction.

We laid out a 3-4-5 right triangle to give us a good right angle for staking two sides of the edge restraint in place. After this, we laid down 7/8" screed rails to level our bedding sand with the screed board (which was just another piece of edge restraint).

Once we had a sand bed we liked we reassembled our paver design, with the half-pavers cut on the paver saw with a diamond blade.

Transferring the pavers onto the sand beg was very satisfying. We worked from one corner towards the opposite. A few taps of attitude adjustment from the rubber mallet were needed to keep the pavers in line.

We swept in joint sand and used the plate compactor to settle it in.





Looked good in the end.




High fives were had by all.





Landscape Construction -- Concrete paver

Our landscape construction project for poured concrete was to make a 2' x 2' paver.

As an experiment we placed some leaves from a red maple (Acer rubrum) in the bottom on a small bed of sand. The form was made from screwed together lengths of 2x4 that we cut with a circular saw.

Some care was needed when putting in the first bit of concrete not to mess up the arrangement of the leaves. Once we carefully got the leaves tacked down, we were able to pour more aggressively from the wheel barrow.

After floating the poured concrete we applied a broom finish and cleaned up the edges.
For our project, it was a little too wet when we did the first pass of the finish so the team
decided to see if we could clean it up with a second pass. This made the surface a little rougher, but left us with a better result overall.

After removing the form and flipping it over we could see the leaves. It will be interesting to see what it looks like after the leaves weather away.

Landscape Construction -- Gravel path

Today our landscape construction class at PCC set out to continue a gravel path that was started by the Tuesday night class.


The excavation was already done for us and the geotextile fabric was in place. While folks gathered up gravel and poured the first lift, I brought over the plate compactor on the compact utility loader.

After the lift was roughly level Juan Carlos used the plate compactor to jiggle everything into place. Pavers were used to edge the path with a lot of attention paid to keeping everything straight.

After the edges were well positioned we filled the soil outside the path to support the edges while the next lift of gravel was poured in and raked to a rough level.





This lift was hand tamped and cleaned up with the addition of a little more gravel as needed.









In the end, it looked pretty good.


















Tuesday, August 3, 2010

Masonry Lesson

I was glad to get a chance to learn a little bit of masonry skills in the course of the job to clean up our brick work...